Production hall with canteen ALTECH Uherské Hradiště
In mid-May 2023, we completed, entirely without defects, a two-storey prefabricated production hall together with a company canteen for ALTECH s.r.o. Uherské Hradiště, with dimensions of 40x40 m and a parapet height of 9.2 m. The clear height on the ground floor under the truss is 4.5 m, and on the first floor it is 3.5 m. The company is the largest Czech manufacturer of compensatory equipment for people with disabilities, with more than 30 years of tradition, and also offers high-quality and advanced solutions for overcoming barriers in both the private and commercial sectors.
This prefabricated hall, after full completion, will serve as an assembly and completion workshop from September 2023. Part of the first floor contains full facilities for the canteen, with a company kitchen for 250 employees, sanitary facilities, and an outdoor terrace. Due to the intended use, there were high requirements for fire resistance, so that the entire hall meets a fire resistance of 30 minutes. In the future, photovoltaic panels are planned for the roof.
The hall includes several staircases, an external emergency staircase, many skylights, light tubes, a fire ladder, etc. It is also equipped with sectional doors that facilitate handling, as well as one sectional door on the first floor with a safety barrier for stocking materials to the first floor.
HALL PARAMETERS:
Purpose: production assembly workshop and company canteen with terrace
Color: white RAL 9010 and blue RAL 5010
- Structure – reinforced concrete structure with 2 floors, supplemented by SPIROLY without crane track, with fixed columns, fire resistance R 30 DP1
- Metalwork elements – fire ladder with dry riser 10m 1pc, emergency staircases 2pcs, safety barrier
- Roof – Combi roof, built-up, thickness 260mm. The price of the roof includes trapezoidal sheet 1160/250/0,75-0,88, thermal insulation, waterproofing (membrane), sheet metal finishing, fasteners, and downpipes to floor level.
- Walls – Cladding made of sandwich PIR panel - thickness 120mm (KS1000 NF thickness 120mm, fire resistance EW/EI 30 DP3) and also mineral sandwich panel - thickness 150mm (KS1000 FR thickness 150mm, fire resistance EW/EI 30 DP1). More about the panels can be found in the section Materials/Sandwich panels.
- Windows and doors – Plastic windows as per elevations and emergency doors: 1.1x2.1m 5pcs, of which one is fire-resistant EW 30DP3
- Gates – Sectional gates on the 1st floor 4.0x3.3m 4pcs and on the 2nd floor 2.3x2.8m 1pc
- Skylights – dome-shaped 1.1x1.1m 11pcs and 1.0x2.0m 21pcs, some of which are openable, and in the canteen area fire-resistant with wired glass
- Light tubes – circular, diameter 800mm, 4pcs
Investor: ALTECH, spol. s r. o.
Place of implementation: Uherské Hradiště
Hall type: Manufacturing
Dimensions: 40 × 40 × 9 m
Area: 1600 m2
Year of implementation: 2023
„Satisfaction with the conduct and completion of the work within the specified time.“
Consult an expert
Similar completed halls
Production Hall 22 ALTECH Uherské Hradiště
Investor: ALTECH, spol. s r.o.
Place of implementation: Uherské hradiště
Hall type: Manufacturing
Dimensions: 20 × 40 × 9 m
Sales and warehouse hall Kružík Kroměříž
Investor: Kružík s. r. o.
Place of implementation: Kroměříž
Hall type: Manufacturing
Dimensions: 18 × 29 × 5 m
Dobeš Metalworking Production Hall Zlín
Investor: Dobeš Kovovýroba
Place of implementation: Zlín - Lůžkovice
Hall type: Manufacturing
Dimensions: 15 × 55 × 7 m
Extensions of the BM plus production hall in Holešov
Investor: BM plus s. r. o.
Place of implementation: Holešov
Hall type: Manufacturing
Dimensions: 25 × 14 × 4 m
Production and storage hall with a 3.2t overhead crane Chytil Otrokovice
Investor: Ivo Chytil - kalírna
Place of implementation: Otrokovice
Hall type: Manufacturing
Dimensions: 15 × 20 × 6 m
Production hall with technology of Vinařství Ludwig Němčičky
Investor: Vinařství Ludwig s. r. o.
Place of implementation: Němčičky
Hall type: Manufacturing
Dimensions: 10 × 18 × 10 m
Reconstruction of the cladding of the ZAKO TURČÍN hall in Provodov
Investor: ZAKO TURČÍN, spol. s. r. o.
Place of implementation: Provodov
Hall type: Manufacturing
Dimensions: 15 × 45 × 4 m
SP PROFIL Production Hall Cvrčovice
Investor: SP PROFIL s. r. o.
Place of implementation: Cvrčovice
Hall type: Manufacturing
Dimensions: 15 × 60 × 4 m
Production hall with administration KT TECH Valašské Meziříčí
Investor: KT TECH s. r. o.
Place of implementation: Hrachovec - Valašské Meziříčí
Hall type: Manufacturing
Dimensions: 13 × 59 × 6 m




































