Dobeš Metalworking Production Hall Zlín
- Structure – steel structure, fire resistance R 15 DP1 including crane runway for 5t overhead crane
- Metalwork elements – canopy above the gate 1.5 x 6 m
- Roof – Roof PIR panel RW thickness 120 mm, fire resistance RE 15 DP3
- Walls – Cladding from sandwich PIR panel – PIR panel 1000 NF thickness 100 mm, fire resistance EW/EI 15 DP3
- Windows – according to elevations, in white color
- Doors – plastic, 1.1 x 2.1 m and 1.5 x 2.3 m, 1 pc
- Gates – Sectional gates 6.1 x 4.5 m, 1 pc and 4.1 x 3.1 m
- Roller shutter – Fire-resistant textile roller shutter EW15 DP1 6 x 4.5 m
- Skylight – ridge arched skylight 2.0 x 30.0 m, 1 pc with 2 openings and wind and rain sensors

Investor: Dobeš Kovovýroba
Place of implementation: Zlín - Lůžkovice
Hall type: Manufacturing
Dimensions: 15 × 55 × 7 m
Area: 825 m2
Year of implementation: 2023
„Friendly approach, speed, and quality in the construction of the hall.“
Consult an expert
Similar completed halls
Production Hall 21C with Canteen ALTECH Uherské Hradiště
Investor: ALTECH, spol. s r. o.
Place of implementation: Uherské Hradiště
Hall type: Manufacturing
Dimensions: 40 × 40 × 9 m
Production Hall 22 ALTECH Uherské Hradiště
Investor: ALTECH, spol. s r.o.
Place of implementation: Uherské hradiště
Hall type: Manufacturing
Dimensions: 20 × 40 × 9 m
Sales and warehouse hall Kružík Kroměříž
Investor: Kružík s. r. o.
Place of implementation: Kroměříž
Hall type: Manufacturing
Dimensions: 18 × 29 × 5 m
Extensions of the BM plus production hall in Holešov
Investor: BM plus s. r. o.
Place of implementation: Holešov
Hall type: Manufacturing
Dimensions: 25 × 14 × 4 m
Production and storage hall with a 3.2t overhead crane Chytil Otrokovice
Investor: Ivo Chytil - kalírna
Place of implementation: Otrokovice
Hall type: Manufacturing
Dimensions: 15 × 20 × 6 m
Production hall with technology of Vinařství Ludwig Němčičky
Investor: Vinařství Ludwig s. r. o.
Place of implementation: Němčičky
Hall type: Manufacturing
Dimensions: 10 × 18 × 10 m
Reconstruction of the cladding of the ZAKO TURČÍN hall in Provodov
Investor: ZAKO TURČÍN, spol. s. r. o.
Place of implementation: Provodov
Hall type: Manufacturing
Dimensions: 15 × 45 × 4 m
SP PROFIL Production Hall Cvrčovice
Investor: SP PROFIL s. r. o.
Place of implementation: Cvrčovice
Hall type: Manufacturing
Dimensions: 15 × 60 × 4 m
Production hall with administration KT TECH Valašské Meziříčí
Investor: KT TECH s. r. o.
Place of implementation: Hrachovec - Valašské Meziříčí
Hall type: Manufacturing
Dimensions: 13 × 59 × 6 m