Reconstruction of the cladding of the ZAKO TURČÍN hall in Provodov
At the end of August 2023, we completed the full reconstruction and insulation of the hall for the company ZAKO TURČÍN s.r.o..
The HARD Jeseník type hall was built in the 1980s and no longer met the parameters of modern requirements, both in terms of insulation of prefabricated halls and appearance. The investor needed to have the hall quickly renovated by September 4, 2023, when they were holding a presentation of their products for their business partners on the premises. The interior of the hall had already been renovated earlier, and for several years the hall has served as the drying section of the paint shop line of the adjacent paint shop.
HALL PARAMETERS:
Purpose: paint shop
Color: light silver RAL 9006 and blue RAL 5010
- Structure – original HARD Jeseník type
- Metalwork elements – auxiliary structures for supporting the cladding
- Roof – sandwich PIR panel KS1000 RW thickness 160 mm
- Walls – Cladding made of sandwich panel - KS1150 NC 120 mm. More about the panels can be found in the Materials/Sandwich panels section.
- Doors – Sectional doors solid, color RAL 9006, 3.5x3.4 m, 2 pcs
- Doors – Sectional doors solid, color RAL 9006, 4.2x3.4 m, 1 pc
- Windows – plastic, color white, 3.6x1.7 m, 19 pcs
- Fire protection – addressed in a previous renovation to R30 minutes
- Skylight – none

Investor: ZAKO TURČÍN, spol. s.r.o.
Place of implementation: Provodov
Hall type: Manufacturing
Dimensions: 15 × 45 × 4 m
Area: 675 m2
Year of implementation: 2023
„Speed“
Consult an expert
Similar completed halls
Production Hall 21C with Canteen ALTECH Uherské Hradiště
Investor: ALTECH, spol. s r. o.
Place of implementation: Uherské Hradiště
Hall type: Manufacturing
Dimensions: 40 × 40 × 9 m
Production Hall 22 ALTECH Uherské Hradiště
Investor: ALTECH, spol. s r.o.
Place of implementation: Uherské hradiště
Hall type: Manufacturing
Dimensions: 20 × 40 × 9 m
Sales and warehouse hall Kružík Kroměříž
Investor: Kružík s. r. o.
Place of implementation: Kroměříž
Hall type: Manufacturing
Dimensions: 18 × 29 × 5 m
Dobeš Metalworking Production Hall Zlín
Investor: Dobeš Kovovýroba
Place of implementation: Zlín - Lůžkovice
Hall type: Manufacturing
Dimensions: 15 × 55 × 7 m
Extensions of the BM plus production hall in Holešov
Investor: BM plus s. r. o.
Place of implementation: Holešov
Hall type: Manufacturing
Dimensions: 25 × 14 × 4 m
Production and storage hall with a 3.2t overhead crane Chytil Otrokovice
Investor: Ivo Chytil - kalírna
Place of implementation: Otrokovice
Hall type: Manufacturing
Dimensions: 15 × 20 × 6 m
Production hall with technology of Vinařství Ludwig Němčičky
Investor: Vinařství Ludwig s. r. o.
Place of implementation: Němčičky
Hall type: Manufacturing
Dimensions: 10 × 18 × 10 m
SP PROFIL Production Hall Cvrčovice
Investor: SP PROFIL s. r. o.
Place of implementation: Cvrčovice
Hall type: Manufacturing
Dimensions: 15 × 60 × 4 m
Production hall with administration KT TECH Valašské Meziříčí
Investor: KT TECH s. r. o.
Place of implementation: Hrachovec - Valašské Meziříčí
Hall type: Manufacturing
Dimensions: 13 × 59 × 6 m