In this window you can adjust the use of cookies according to your preferences. If you leave the default settings, only cookies that are necessary for the website to function will be allowed.
Technical cookies are essential for the functioning of the website and cannot be disabled. They are usually set in response to actions you take on the website, such as security settings, logging in and filling in forms. These cookies may be set by us or by third-party providers whose services we use on the website, and do not store any information that can be attributed to a specific person. You can set your browser to block cookies or to notify you about them. However, please note that some websites may not function properly without these cookies.
| Cookie | Description |
|---|---|
| cookies_level | Your cookie settings from this dialog |
| PHPSESSID | Session cookie that maintains the ID of the current session |
Analytical and performance cookies are used to analyze website traffic and further improve its operation. They help us understand visitors' interests and how they use our website. These cookies do not collect information that could identify you.
| Cookie | Description |
|---|---|
| _ga_VYXZPTFH6E | Cookies of the Google Analytics analytical system |
| _ga | Cookies of the Google Analytics analytical system |
| pageviewCount | Google cookies |
They are used to track visitors on websites. The intention is to display advertising that is relevant and interesting to the individual user and thus more valuable to publishers and third-party advertisers.
| Cookie | Description |
|---|---|
| _gcl_au | Cookie of the Google AdSense marketing system |
| leady_session_id | Cookie of the Leady marketing system |
In May 2025, we completed and handed over a warehouse hall in Grygov near Olomouc. The hall will serve as a storage facility for finished concrete products. The dimensions of the hall are 18.1 x 36.4 m with an eaves height of 6.0 m. We built the hall, including a partition and infills, in a record 13 working days. The hall includes a partition made of mineral panels.
The warehouse also includes a built-in office for the warehouseman.
Purpose: Warehouse hall
Dimensions: 18.1 x 36.4 m
Clear height under truss: 5.1 m
Eaves height: 6.0 m
Structure:
Cladding:
Infills:
At the beginning of April 2026, we completed the construction of a prefabricated production hall for the company BM Plus in Holešov. The building is designed as a classic frame structure with a mono-pitched roof.
In February 2026, we completed the construction of a prefabricated hall with a reinforced concrete structure in Uherské Hradiště for the company ALTECH. The company is the largest Czech manufacturer of compensatory devices for immobile persons with more than 30 years of tradition.
In mid-March 2026, we completed and handed over two halls connected into one building. The single-story section is intended for production and storage for the investor FM Metal s.r.o. The two-story section will serve as administrative facilities and a showroom.
At the beginning of March 2026, we handed over a small two-storey administrative extension, which will help to further develop the office facilities of R.A. servis in Štěpánkovice. The extension, located on the edge of the property with difficult access, was built while the adjacent hall remained in continuous operation.
In February 2025, we completed a prefabricated insulated hall, which follows on from previous phases of the reconstruction of an older industrial complex.
At the end of February 2026, we completed and handed over to the general contractor W&W STAVBY s.r.o. an agricultural hall for a robotic milking parlor with facilities.
At the end of January 2026, we completed a prefabricated warehouse hall measuring 11 x 24.4 m for the company ČEPS Invest in Chotějovice. The building is designed as a classic frame structure and serves as a storage facility for parts. The hall includes a crane runway for an overhead crane with a lifting capacity of 5 t.
In December 2025, we completed and handed over a warehouse hall with a 3.2 t overhead crane in Grygov near Olomouc. The hall will serve as a warehouse for finished concrete products. The dimensions of the hall are 17 x 26 m with an eaves height of 8.0 m.
In December 2025, we completed and handed over a production hall at Šteklův mlýn in Dolní Chvatliny. The hall will be used for a carpentry workshop with social and office facilities. The dimensions of the hall are 11.5 x 20 m with an eaves height of 3.6 m.








